From the model
lynxking
A manufacturing unit model specializing in pet provides with an expert group. We insist on utilizing the very best supplies to make the very best merchandise.
lynxking canine leasgh sequence
canine leash and collar
slip lead & verify wire sequence
slip lead & verify wire sequence
slip lead canine leash Braided
Canine Leash Webbing Lead
Test Twine Canine Leash Lengthy
Canine Collar Delicate Padded
Snap lead canine leash
Braided Canine Coaching Leash
Double Deal with Canine Leash
Product Dimensions : 118.11 x 39.37 x 0.37 inches; 12.49 Ounces
Date First Accessible : July 20, 2019
Producer : Keenleader.,ltd.
ASIN : B08HM4QFDR
Nation of Origin : China
NO TANGLE LONG ROPE LEASH: the spherical climbing rope and 360 diploma rotating clasp design lengthy coaching leash won’t tangle whether or not it’s in use or if you roll it up, nice for mountain climbing, tenting, coaching, looking, yard, seaside, recall coaching, out of doors play with tennis balls, and swimming
LIGHTWEIGHT AND NOT ABSORB WATER: tender and light-weight Non-absorbent materials will not get an increasing number of heavy within the water and gained’t sink, it would float when submerged and extremely seen towards any background.
SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: verify wire has a snug woven double layer deal with, the joint of the rope is sewn by the machine and may be very robust.
SIZE: 3/8″ (9.5 mm) in diam ,Measurement of this one is 30foot,shade blue, by 10 foot 15 foot, 30 foot and 50 foot three size for various coaching function
There are no reviews yet.